1.01 |
Axially Split Casing Pump Units |
10 |
12/03/2023 |
1.02 |
Submersible Pump Units |
9 |
12/03/2023 |
1.03 |
Dry Well (Volute Casing Type) Sewage/Sludge Pump Units |
8 |
12/03/2023 |
1.04 |
Progressing Cavity Pump Units* |
6 |
15/03/2021 |
1.05 |
Submersible Borehole Pump Units |
5 |
13/03/2023 |
1.06 |
Positive Displacement Pumpsets for Sludge Pumping – superseded by WIMES 1.07-1.11 |
2 |
01/03/2003 |
1.07 |
Ram Pump Units* |
4 |
15/03/2021 |
1.08 |
Peristaltic Pump Units* |
4 |
15/03/2021 |
1.09 |
Single Diaphragm Pump Units* |
4 |
15/03/2021 |
1.10 |
Double Disc Pump Units* |
4 |
15/03/2021 |
1.11 |
Rotary Lobe Pump Units* |
4 |
15/03/2021 |
1.12 |
Packaged Water Booster Sets (Positive Inlet Pressure Applications) |
5 |
12/03/2023 |
1.14 |
Pump Unit Repair/Overhaul |
2 |
07/04/2017 |
1.15 |
End Suction (Back Pull-Out Type) Pump Units |
4 |
12/03/2023 |
1.16 |
Vertically Suspended (Bowl Type) Pump Units |
4 |
12/03/2023 |
1.17 |
Vertical Multistage Pump Units |
3 |
12/03/2023 |
1.18 |
Canister-Mounted Axial and Mixed Flow Submersible Pump Units |
3 |
12/03/2023 |
1.19 |
Pipe-Mounted Axial and Mixed Flow Submersible Pump Units |
3 |
12/03/2023 |
2.01 |
Rotating Settlement Tank Scrapers* |
6 |
20/06/2022 |
2.02 |
Grit Removal and Treatment Equipment* |
6 |
20/06/2022 |
2.03 |
Package Inlet Works for Waste Water Treatment* |
5 |
20/06/2022 |
2.04 |
Low and High Speed Vertical Shaft Surface Aerators* |
4 |
20/06/2022 |
3.01 |
Low Voltage Switchgear and Controlgear Assemblies |
6 |
23/08/2023 |
3.02 |
Low Voltage Electrical Installations + AMENDMENTS |
5 |
11/07/2019 |
3.02 (A) |
Profibus Networks |
3 |
11/07/2019 |
3.02 (B) |
Optical Fibre Networks |
2 |
11/07/2019 |
3.02 (C) |
Lightning Protection |
2 |
11/07/2019 |
3.02 (D) |
Electrical Installations in Hazardous Areas + AMENDMENTS |
1 |
11/07/2019 |
3.02 (E) |
Lighting Installations |
1 |
11/07/2019 |
3.02 (F) |
Electric Space Heating Installations |
1 |
11/07/2019 |
3.02 (G) |
Fire Detection and Alarm Systems |
1 |
11/07/2019 |
3.02 (H) |
Electric Vehicle Charging Installations |
1 |
11/07/2019 |
3.03 |
Low Voltage, 3 Phase, TEFC Motors* |
8 |
20/06/2022 |
3.04 |
Low Voltage Electrical and ICA Specification for Package Plant |
6 |
19/08/2024 |
3.05 |
Electrical Components (For Use in LV Assemblies) |
5 |
23/08/2023 |
3.06 |
Diesel Powered Generator Sets and Installations + AMENDMENTS |
5 |
06/08/2021 |
3.06 (FAT sched) |
Diesel generator installation FAT schedule |
5 |
20/11/2023 |
3.06 (SAT sched) |
Diesel generator installation SAT schedule |
5 |
20/11/2023 |
3.07 |
AC Double Conversion Uninterruptible Power Supplies (rated </= 40 kA) |
6 |
19/08/2024 |
3.08 |
Electric Valve Actuators* |
5 |
20/06/2022 |
3.09 |
MV Ring Main Units (1-22kV)* |
4 |
20/06/2022 |
3.10 |
MV Distribution Switchgear Assemblies (1-22kV)* |
4 |
20/06/2022 |
3.11 |
MV Distribution and Power Transformers (1-22kV)* |
4 |
20/06/2022 |
3.12 |
MV Motor Starter Assemblies (1-7.2 kV)* |
4 |
20/06/2022 |
3.13 |
MV Electrical Installations (1-22 kV) |
3 |
10/04/2018 |
3.15 |
Standalone Variable Speed Drives* |
2 |
20/06/2022 |
3.16 |
MV 3 Phase AC Motors |
1 |
19/01/2022 |
4.01 |
Paints & Polymeric Coatings for Corrosion Protection |
5 |
23/08/2018 |
5.01 |
Raw Water Intake Screens* |
4 |
20/06/2022 |
5.02 |
Coarse Screens for Sewage Treatment* |
3 |
20/06/2022 |
5.03 |
Fine Screens for Sewage Treatment* |
6 |
20/06/2022 |
5.04 |
Overflow Screens for Sewerage Systems and Sewage Treatment Works* |
7 |
28/02/2024 |
5.05 |
Sludge Screens* |
4 |
20/06/2022 |
6.03 |
Screenings Handling Equipment* |
5 |
20/06/2022 |
7.01 |
Decanter Centrifuges* |
6 |
20/06/2022 |
7.02 |
Membrane Bioreactors for Waste Water Treatment* |
2 |
20/06/2022 |
7.03 |
Sludge Thickeners* |
5 |
20/06/2022 |
7.04 |
Sludge Conveyors* |
3 |
20/06/2022 |
8.01 |
UV Disinfection Equipment for Waste Water Treatment (Open Channel)* |
2 |
20/06/2022 |
8.01(B) |
Ultra Violet Disinfection Systems (Water Treatment) |
3 |
31/08/2023 |
8.02 |
Chemical Dosing Equipment (General Requirements) + AMENDMENTS |
4 |
10/06/2022 |
8.02 (A) |
Sodium Hydroxide Dosing Equipment |
4 |
10/06/2022 |
8.02 (B) |
Sodium Hypochlorite Dosing Equipment + AMENDMENTS |
4 |
10/06/2022 |
8.02 (C) |
Sulphuric Acid Dosing Equipment |
4 |
10/06/2022 |
8.02 (D) |
Coagulant and Phosphate Removal Chemical Dosing Equipment + AMENDMENTS |
4 |
10/06/2022 |
8.02 (E) |
Lime Slurry and Limewater Dosing Equipment |
4 |
10/06/2022 |
8.02 (F) |
Orthophosphoric Acid Dosing Equipment |
4 |
10/06/2022 |
8.02 (G) |
Polymer Dosing Equipment |
4 |
10/06/2022 |
8.02 (H) |
Nitrate Chemical Dosing Equipment |
2 |
10/06/2022 |
8.02 (I) |
Sodium Bisulphite Dosing Equipment + AMENDMENTS |
2 |
10/06/2022 |
8.03 |
Mechanical Installation |
5 |
04/06/2021 |
8.04 |
Air Blowers* |
5 |
20/06/2022 |
8.05 |
Odour Control Equipment |
4 |
31/10/2024 |
8.06 |
Dissolved Air Flotation Plant* |
2 |
20/06/2022 |
8.07 |
Compressed Air Systems* |
3 |
20/06/2022 |
8.08 |
Pipework (Non-Buried Applications) + AMENDMENTS |
1 |
04/06/2021 |
8.08 (P test) |
Pipework Pressure Test Record Sheet and Schedule |
1 |
04/06/2021 |
8.08 (Sched) |
Pipework Schedule |
1 |
04/06/2021 |
8.09 |
Valves + AMENDMENTS |
2 |
11/03/2021 |
8.09 (Sched) |
Valve Schedule |
2 |
11/03/2021 |
8.10 |
Penstocks, Stopgates, Stoplogs and Handstops |
2 |
11/03/2021 |
8.10 (Sched) |
Penstock Schedule |
2 |
11/03/2021 |
8.11 |
Static Mixers |
3 |
12/04/2023 |
8.12 |
Submersible Mixers |
3 |
12/04/2023 |
8.13 |
Vertical Shaft (Top Entry) Mixers |
3 |
12/04/2023 |
8.15 |
Pile Cloth Disc Filters for Tertiary Solids Removal |
1 |
20/11/2024 |
9.01 |
CHP Installations* |
3 |
20/06/2022 |
9.02 |
Permanent Access Fabrications + AMENDMENTS |
1 |
07/03/2019 |
LCC01 |
LCC Model for Centrifugal Pump Units |
3 |
12/04/2023 |
LCC01 (Guidance) |
LCC Model for Centrifugal Pump Units (Guidance Notes) |
3 |
12/04/2023 |
LCC02 |
LCC Model for LV Motors |
2 |
13/10/2014 |
LCC02 (Guidance) |
LCC Model for LV Motors (Guidance Notes) |
2 |
13/10/2014 |
LCC03 |
LCC Model for Positive Displacement Pump Units |
2 |
07/04/2017 |
LCC03 (Guidance) |
LCC Model for Positive Displacement Pump Units (Guidance Notes) |
2 |
07/04/2017 |
LCC04 |
LCC Model for Air Blowers |
1 |
01/10/2012 |
LCC04 (Guidance) |
LCC Model for Air Blowers (Guidance Notes) |
1 |
01/10/2012 |
LCC05 |
LCC Model for UVD Eqpt (Water Treatment) |
1 |
15/08/2014 |
LCC05 (Guidance) |
LCC Model for UVD Eqpt (Water Treatment Guidance Notes) |
1 |
15/08/2014 |
LCC06 |
LCC Model for Odour Control Eqpt |
2 |
31/10/2024 |
LCC06 (Guidance) |
LCC Model for Odour Control Eqpt (Guidance Notes) |
2 |
24/10/2024 |
LCC07 |
LCC Model for MV Motors |
1 |
19/01/2022 |
LCC07 (Guidance) |
LCC Model for MV Motors (Guidance Notes) |
1 |
19/01/2022 |
LCC08 |
LCC Model for Mixers |
1 |
13/04/2023 |
LCC08 (Guidance) |
LCC Model for Mixers (Guidance Notes) |
1 |
13/04/2023 |
WECC |
WIMES Embodied Carbon Calculator |
2 |
16/08/2023 |
WIGD 1104i1 |
The Selection and Use of Lubricants for Machinery in Contact with or Close Proximity to Potable Water Supplies |
1 |
01/04/2004 |